![]() |
![]() |
||||
![]() |
|||||
![]() |
November 10, 2004 The actual groundbreaking and construction started today. First the plumbing for the additional 9 sinks, 3 floor drains and our washer must be added to the floor. The 2 doors on the right are for the existing restrooms. These will basically remain as they are with just cosmetic changes.This picture was taken from a spot near the doors and the trench nearest us is for examination room sinks. |
||||
![]() |
|||||
![]() |
|||||
©2004
Best Friends Animal Clinic LLC WebMaster@BestFriendsAnimalClinic.com |
|||||