Best Friends Animal Clinic, LLC
4197-A3 Winchester RDMarshall, VA 20115(540)364-7855
www.bestfriendsanimalclinic.com
|
February 14, 2005
The ceiling grid and LIGHTS.
The base frame for the cages is in place(lower right). The office window frame has been installed. The drywall finishers have the first coat of joint compound applied and the work above the ceiling grid is almost ready for inspection.
|
Previous Image - Gallery Main Page - Next Image
|